Program Management

The implementation of the R/3 System in large multinational corporations is a more time-consuming and complicated process than for mid-sized companies. For this reason , corporations need to observe certain procedures in order to control costs and avoid the delays that a lengthy rollout might entail. The following graphic shows an example of how global templates can be used to carry out a rollout. On the global level, that is, at corporate headquarters, it is necessary to co-ordinate all activities carried out during implementation and the maintenance/support phase after implementation.

Within Global ASAP, program management is regarded not as a project, but as the providing of official channels of support for the further development of the template, the ongoing work on group-specific standards and the rollout of the corresponding system functionality. These global activities need to be carried out and clearly defined centrally for all local systems.

Figure xx: Projects to Complete a Group Rollout

When local project activities are carried out, the program team at the global level is not actually responsible for the productive start of any systems at the local sites. This is the main task of the local project teams. Here it is important to differentiate between tasks carried out at the global and local levels, as well as to differentiate between resources used for development and resources used in the rollout itself.

The developments described here contain a global implementation strategy based on global templates and distributed system topologies. This is where R/3 customers will reap the greatest benefit. Within Global ASAP, further release strategies and enhancements containing new contents and functions which apply to the Global ASAP Roadmap will follow.

Accelerated SAP ii

AcceleratedSAP is a comprehensive solution for the implementation of the R/3 System, comprising a proven methodology, tools and a range of services for the rapid implementation and ongoing optimization of R/3 installations.

The AcceleratedSAP Roadmap and accompanying Project Plan provide a standard implementation "how-to guide" that fills in the gaps of diverse methodologies and varying individual implementation skills and experiences.

The effectiveness of AcceleratedSAP has been demonstrated many times over at companies around the world. The Business Engineer plays a central role in AcceleratedSAP projects, being used for completion of configuration tasks.

Fig. XX: Breakdown of ASAP phases in the Implementation Assistant

The AcceleratedSAP Roadmap covers the different aspects and phases of an implementation. In the Roadmap, a detailed project plan is included for the five phases. The Roadmap provides a standard repeatable procedure for implementing the R/3 System, including project management, configuration of business processes, technical, testing and training aspects. The Roadmap serves as a backbone to AcceleratedSAP. It is located within the Implementation Assistant, a PC-based navigation tool that also contains the AcceleratedSAP accelerators.

The ASAP Accelerators represent a collection of descriptions, how-to's, templates and examples on all subjects relating to the implementation of the R/3 System. Some are short information texts on a particular subject, others are longer texts such as white papers. There are also a number of predefined and empty templates or forms which you can use when carrying out your implementation. The SAP Simplification Group's guidebooks are included. There are about 350 accelerators for AcceleratedSAP 4.0, and they can be accessed from an alphabetical list, as well as being linked to the individual roadmap How-to's.

There are four levels to the roadmap – phase, work package, activity, task. As you dig deeper into the levels, you will find more detailed information, from an overview description at the phase level down to a "how-to" procedure, role assignment, triggers, and tips and tricks.

It is essential that you create a project plan when starting your ASAP implementation project. Project plans have three parts:

  • The Budget Plan contains the projected costs by month, against the actual costs and calculates the variance.
  • The Resource Plan contains the resources assigned to the R/3 implementation. It displays the planned and actual number of workdays per month, as well as the variance between the two. It also contains a cumulative planned hours work sheet.
  • The Work Plan contains a detailed set of phases, work packages, activities, and tasks from the AcceleratedSAP Roadmap. This information is organized in a project management planning tool (MS-Project or Excel spreadsheet). A Gantt Chart is contained within this work plan to view schedules, dependencies and resources in MS-Project.

Three sample project plans are included for a six-month duration, a nine-month duration, and an upgrade project plan. If the Project Estimator is used during the sales cycle and Project Preparation Phase, your individual project plan is generated automatically, taking into consideration company-specific risk factors. The project plan makes sure that nothing is forgotten and that all activities can be tracked and managed. This means, for instance, that the planning for data transfer and the development and testing of interfaces is already included in the project plan.

It is now possible to implement more than one ASAP project at a time. During installation, Rel. 4.0 of ASAP asks you to specify a project name that will apply to the files being installed. In a multi-project environment a new Project Selector icon on your desktop allows you to set the active project, remove projects and review file locations.

You can select installed components such as the Implementation Assistant and Q&Adb in the respective projects as required. Each project is completely separate from the others, so in fact projects installed on the same server could be at different update levels.

AcceleratedSAP is a complete implementation solution. This means that in addition to the Roadmap, the AcceleratedSAP solution contains numerous tools and also references SAP education and services to ensure maximum time savings and a high quality implementation.

AcceleratedSAP uses the Business Engineer implementation tools at all relevant steps. In the figure below, for example, the conceptual design is based on the R/3 Reference Model in Phase 2 (Business Blueprint), whereas the Implementation Guide is accessed from ASAP Phase 3 (Realization).

Fig. 2: AcceleratedSAP Implementation Roadmap and R/3 Business Engineer

Service and Support

ASAP leverages SAP's service and support offering, that is, all the services relating to the SAP R/3 environment. EarlyWatch® Services, concept reviews, and GoingLiveTM checks are just part of the service palette which ensure total quality and let you effectively tune your R/3 System. At appropriate steps in the Roadmap, service products are mentioned and decision support is provided to determine whether you need a particular service. For example, if you have a high volume of transactions, certain tuning services can assist you in optimizing system performance.

Crucial to a fast and cost-effective R/3 implementation are well-trained project teams and highly competent consultants. SAP's innovative R/3 Info Database (InfoDB) ensures that customer and partner employees involved in implementing, servicing and using R/3 have all the qualifications they need. The InfoDB refers to a new training concept based on a new curriculum, which also includes multimedia courses.

  • Level 1 courses provide an overview of the R/3 environment.
  • Level 2 courses introduce you to fundamental business processes.
  • Level 3 courses focus on providing detailed information.

Organizational Change Management

The positive motivation of employees is a key factor in ensuring a successful implementation project. However, most organizations know, or will at least assume that the R/3 implementation will trigger wider changes in the organization. Left unmanaged, these expected impacts could be viewed negatively. Therefore, any change management program must minimize the implementation risks, acccelerate the implementation process, and align SAP with the customer's organization.

ASAP's Change Management is done via a risk assessment tool, by which assessments carried out will help a customer's team deal with issues of credibility, organizational impact, and individual impact of R/3 implementation. Implementing change management procedures involves accelerating the implementation by means such as a matrix that defines the degree to which jobs and responsibilities will be changed after R/3 implementation. The other aspect is to work with executive sponsors to redesign the organization's structure or reporting relationships, for example. The ASAP change management methodology enables you to review and revise the types and sequencing of change tasks, change activities, change packages and change accelerators.

  • A change task is a specific job or function to be completed by the change team.
  • Two or more change tasks roll up into a change activity.
  • A change package is a collection of change activities.
  • Change accelerators are the tools and/or materials that speed up the team's implementation of a processs, activity or task.

Knowledge Corner

The Knowledge Corner contains alphabetized information on all aspects of AcceleratedSAP as well as a lot of tips and tricks for configuration. The information provided here is very helpful during requirements gathering and configuration. The goals of the Knowledge Corner are:

  • To provide application consultants with detailed information and alternatives to configure and understand specific functionality within the R/3 System.
  • To provide detailed information about peripheral activities, such as support services and access to hotline activity.
  • To provide tips and tricks on R/3 implementation activities such as data conversion, authorization management, and forms development.

Some of the newer elements found in the Knowledge Corner are:

  • A link to the R/3 Interface Adviser, which provides a central pool of information to help you design and implement permanent interfaces between SAP R/3 components and non-SAP systems.
  • The R/3 Structure Modeler, which lets you graphically visualize the R/3 System organizational structures of your enterprise using the Structure Modeler Visio® template. Please note, you must be a licensed Visio® user to use this Accelerator.
  • The Report Navigator, which provides a directory of more than 2,000 operational reports available in standard R/3. The Operational Reports in R/3 help you pull and analyze critical transactional information regarding your business. You can use the R/3 Report Navigator to select the report that is optimal for the information you want to retrieve about your business transactions.

Available Languages

Primary components of AcceleratedSAP are available in German and English, as well as Spanish, French and Portuguese.

Accelerated Quality Review

SAP's Accelerated Quality Review provides an independent and objective management review of your R/3 implementation project and identifies any risks to the project goals. This service is standard in all TeamSAP projects. Among others, the benefits are early recognition of potential risk areas, improved adherence to project schedules, lower cost, and faster implementation times.

Fig. 7: Checking and quality tools around ASAP

The Quality Review program offered by SAP is not a review of the project for conformance to the ASAP tools and templates, but rather assists the executive management and project manager at customer sites in providing a second opinion of the implementation progress towards achieving the project goals. The scope of the review is to investigate the application, technical and project management areas of the implementation. The review looks for good implementation practices while following a prescribed methodology.

TeamSAP

TeamSAP refers to the coordinated network of people, processes and products from SAP and partners that delivers continuous, fast, integrated and assured solutions. AcceleratedSAP is the main process component of TeamSAP.

  • The people:
  • SAP employees and certified implementation partners providing leadership, project coordination and know-how to implement, maintain and support R/3 based on your requirements.
  • The processes:
  • AcceleratedSAP with the embedded Business Engineer functionality, as well as integrated support, services and training on all levels.
  • The products:
  • The R/3 System with its strategic product architecture and open interfaces, providing both scalability and flexibility in an ever-changing business environment. Also, hardware and software products from hundreds of complementary software partners and hardware providers certified by SAP.

Fig. 3: Elements of TeamSAP

TeamSAP supports the concept of business change as a continuum. The goal is to offer SAP customers a full complement of TeamSAP resources to enable rapid technology upgrades or change-outs for access to new functionality. With respect to ASAP, this means that TeamSAP partners are available to carry out implementations, as well as ASAP-certified partners to carry out "Powered by ASAP projects". TeamSAP projects refer to projects carried out by TeamSAP partners, the use of ASAP or Powered-By implementation methodology, Project Quality Review, the assignment of an SAP Coach, and SAP's support on the project's steering committee. All of these are factors contributing to a successful implementation.

The following key benefits will enable you to carry out a more effective R/3 implementation and make effective use of your available resources:

  • AcceleratedSAP helps to manage a "Big Bang" implementation strategy with the focus on essential business processes.
  • There is a high degree of planning accuracy (time, costs, resources) through the Project Estimator and the Business Blueprint.
  • AcceleratedSAP lays the foundation for continuous change and efficient reconfiguration when business or legal requirements change.
  • You have a uniform approach to R/3 implementations among partners and consultants worldwide.
  • There is an assured quality and know-how transfer during implementation.
  • You can reuse the results of your configuration for subsequent implementation projects.
  • You have reduced implementation costs and quicker ROI.

Accelerated SAP Introduction

Enterprise application software has to cover a broad spectrum of functionality, yet be configured flexibly enough to meet specific requirements, which can vary enormously. SAP’s answers to this challenge are AcceleratedSAP and the R/3 Business Engineer, providing a comprehensive solution for implementing R/3 quickly, easily, and according to your own needs even during productive operation.

Born out of the need to cost effectively configure R/3 to order, AcceleratedSAP and the Business R/3 Engineer support custom configuration of R/3. You can tailor the R/3 components, functions and organizational structures to your needs, hiding and/or deactivating those functions that are not required.

Fig. 1: The R/3 Business Engineer Complements ASAP

AcceleratedSAP (ASAP) is SAP's standard implementation methodology. It contains the Roadmap, a step-by-step guide that incorporates experience from many years of implementing R/3. Along with that, AcceleratedSAP contains a multitude of tools, accelerators and useful information to assist all team members in implementing R/3. Quality checks are incorporated at the end of each phase to easily monitor deliverables and critical success factors. ASAP is delivered as a PC-based package, so that - if required - an implementation project can begin prior to having an R/3 System installed.

The R/3 Business Engineer contains a set of configuration and implementation tools which enable you or your consultants to define and configure R/3 and also to adapt an existing configuration to new needs or changed circumstances. The Business Engineer is resident to R/3.

So that its customers can implement R/3 as quickly as possible, SAP has standardized the implementation procedure, simplified the way functions are presented and reduced the technical complexity of implementation.

AcceleratedSAP and the Business Engineer help you configure R/3 according to your own needs using proven, industry-specific business scenarios and processes. Whether implementing new processes in your enterprise or restructuring old ones, R/3 can release the full potential of change for you. AcceleratedSAP and the Business Engineer help you determine which of R/3’s proven processes are most suited to your business, and then help you configure to meet your specific needs. The benefit is obvious: Restructuring enterprise processes in the R/3 System leads to a rapid and efficient production startup, meaning a faster return on investment.

By simplifying configuration, ASAP and the Business Engineer make the power of R/3 more accessible, helping companies to lower their dependence on expensive specialists or outside consultants. The user-friendliness of ASAP and the Business Engineer make them particularly suitable for the following groups:

  • Business professionals who need to discuss, prototype and design their business blueprint (enterprise model)
  • IS departments of large enterprises who need to customize R/3 applications more efficiently and more rapidly
  • Small and medium-sized companies previously wary of implementing R/3 because of the perceived scale of such projects
  • Consultants and SAP partners looking for an efficient way of offering their customers configure-to-order or wishing to develop R/3-based solutions for niche markets

Together, AcceleratedSAP and the Business Engineer empower you to manage cost, time and quality without compromising on implementation requirements. Some of the features offered are:

Reduced implementation times and faster return on investment through structured planning and preconfiguration

  • Intuitive understanding of the wide range of functions offered by R/3
  • Process optimization using proven scenarios, processes and value chains, illustrating clearly the software’s capabilities and offering practical help when you configure the R/3 System.

High quality installations through comprehensive procedural guidelines

Optimizing business processes using SAP Business Workflow, via process monitoring and automation of procedures

  • Continuous, dynamic adjustment and optimization of R/3 applications
  • The capability to copy configured areas, for example, by transferring existing settings to new organizational units.

AcceleratedSAP and the Business Engineer are designed for openness and new platforms, using HTML-based documentation. Compatibility with many third-party modeling tools and software packages, for example, Microsoft Excel, is ensured.

Available Tools

Embarking on an implementation project requires a lot of careful thought beforehand. You need to think about what you want to accomplish, the optimum sequence, and the business cases that are best suited to your needs. But SAP has already done a lot of the thinking for you and packaged its findings in the following tools. They are then described in more detail in the following chapters organized according to the corresponding AcceleratedSAP phases.

  1. AcceleratedSAP (ASAP): A comprehensive solution for the introduction of the R/3 System in your enterprise. ASAP and most of its tools can be used independently of an R/3 installation.

The tools available for AcceleratedSAP are:

  • The Project Estimator, an internal SAP tool which enables SAP consultants to accurately gauge the required resources, the costs and the time frame of implementation. The Project Estimator takes into account the project scope and several project and risk factors.
  • The Concept Check Tool, a tool enabling you to carry out quality checks on the project preparation, technical infrastructure and R/3 configuration settings. This is done mainly during the first two implementation phases of the R/3 project. In this way you are alerted to potential data volume and configuration conflicts that could lead to performance issues if not addressed.
  • The Implementation Assistant: The ASAP navigation tool that accompanies you through the five phases of implementation down to the task level. It includes a description and a detailed "how-to" for each task in the Roadmap. Along with that, many tools, templates and documents are hyperlinked to the task. The Implementation Assistant contains the following elements:
  • ASAP Implementation Roadmap
  • and Project Plan. The Roadmap contains the five phases, from which you can drill down into work packages, activities and tasks. The Project Plan contains three components, a budget plan, a resource plan and a work plan. These are explained in more detail in the next chapter.

The ASAP Roadmap is the successor of the R/3-based Procedure Model, which was used until Rel. 3.1 in R/3 implementation projects.

  • Knowledge Corner
  • , containing tips and tricks for configuration from consultants, detailed documentation on SAP’s implementation services, information on technical tools, as well as simplification guidebooks and R/3 Customizing wizards.
  • Question and Answer Database (Q&Adb).
  • Using the R/3 Reference Model structure, the Q&Adb is used to assist in gathering requirements for business processes, conversions, reports, interfaces, enhancements and authorizations. The database provides useful questionnaires to help you define the process needs and also serves as a repository for all this information. Since it is a database, it allows for flexible reporting. The business requirements generated from the Q&Adb are collectively known as the Business Blueprint.
  • Business Process Master List
  • , to manage configuration, testing and the creation of end user documentation. The Business Process Master List is linked to pre-written Business Process Procedures (BPPs), detailled end-user documentation for R/3 transactions.
  • Issues Database
  • : supporting project management, this database supports the entering, monitoring and managing of issues that come up during the project.
  1. R/3 Business Engineer:
  2. The implementation tools for the high-quality configuration of the R/3 System are:
  • R/3 Reference Model: Comprehensive graphical process flows describing the R/3 functionality from different points of view. It contains scenarios, processes and functions, as well as components. The R/3 Reference Model can be viewed using SAP's Business Navigator and the Business Navigator Web, or using third-party modeling tools available from modeling partners.
  • Implementation Guide
  • (IMG): Used to configure all system parameters for the business processes in R/3. It contains project management functionality and a menu-driven view of all R/3 Customizing activities. Every activity can be documented in detail, and responsibilities and statuses can be assigned.
  1. Preconfigured systems:
  • Preconfigured US and Canadian clients: Provides a head start on baseline configuration. It includes a preconfigured US/Canadian chart of accounts, print forms, account determination, units of measure, etc. The predefined test sequences that are included can be a starting point for integration testing.
  • Preconfigured industry systems: A number of complete preconfigured clients consisting of an industry-specific model and preconfigured business processes for the needs of a particular industry in R/3 are available. For more information on preconfigured systems, see the description of Phase 2, Business Blueprint or the information on the IDES System in this chapter.

Continuous Business Engineering

In today’s fast-moving, ever-changing business climate, companies are in a constant state of flux and their mission-critical applications must adapt and evolve at the same speed. If software cannot grow with the needs of a company, the company will quickly find itself in a straightjacket.

Furthermore, an ERP application needs to let you move forward fast, knowing that you can roll back changes without downtime.

An enterprise's organizational structure and the corresponding R/3 implementation created using the Business Engineer are not "set in concrete", they can be modified at any time. Examples of possible changes, which can be made rapidly include the following:

  • Addition or removal of entities within the organization structure (for example, business units, production plants, warehouses, etc.)
  • Introduction of new staff, promotion, reallocation of work tasks, and maintenance of authorization profiles
  • Changes to the reporting or cost/profit center structure
  • New and concurrent currencies
  • Accommodation of changed legal requirements (for example, new tax rates, new employment legislation)
  • Activation or deactivation of R/3 functions
  • Optimization of business processes
  • Support for new and multiple versions of R/3

In addition, SAP offers a range of services if you want support for some of these changes, for example, conversion services to support mergers and acquisitions. Standard Euro services are a further example of the available services.

AcceleratedSAP and R/3 Business Engineer take the hassle out of implementation procedures and change management. Modifications can be made at any time, and the compatibility of changes can be verified with other configuration decisions, thus supporting their smooth, trouble-free introduction into the productive system.

Issue free goods to selected Customers

Client wants to issue free goods to selected customers after the said customer buys a specified quantity of a good during the festive season starting 02 December to mid January. for example customer A buys 34 cartons of Corn Ice-cream, we offer him 12 free corns. this should then reflect as cost in our accounts. the rest of the system is already up and running and should not be inconvinienced. How do I set it up?

1.Run trans. VBN2 to first create master record for free goods as follows:

Enter following information in selection screen:
- Free goods type: NA00
- Sales org, distribution channel, customer # and execute.

Now in next screen create the record as follows:
- First select the exclusive button and verify that you are in exclusive view.
(that is if you want exclusive)
- Material#, Min qty - Say 34 cartons. (check in what units you want to manage)
From: 34 cartons
unit of measure:
Free goods: 12 Pcs
Unit of measure: Pcs
Calcualtion type: 1 or try the other options
Deliver control: Blank or any of the other options suitable to you.

Now save and exit.

Now run VA01 for 34 cartons and press enter. The system will automatically propose the free goods

item at no additional charge. Try higher order qtys and see if the free goods qty are scaling up.

If not adjust the calculation parameters in the master record screen

It should be transaction VBN1. Sorry for the error.
VBN2 is to change the record. VBN1 creates it.

Kris J


If you want to give free goods to some of the customers than

1. create a customer group say 99 for FREE GOODS

In Free Goods Menu:
2. add a feild catalog for CUSTOMER GROUP
3. create a condition table (free goods) say 555 only for customer group
4. create a sequence say FREE with condition table 555
5. create a condition type say FREE with
6. maintain pricing procedure say ZFREE with condition type FREE

Now assign:
7. Active Free goods Determination or Assign with your sales organisation this procedure ZFREE
8. Create free goods determination with transaction code /nvbn1 for FREE with Key Csuomer Group

99 for exclusive

Give customer Group say 99 and from 34 to 34 free 12

Sales and Distribution - Upload Condition Pricing

RV14BTCI - Batch Input for Uploading Condition Pricing

After executing the program, you have to use SM35 to process the update program.

Envirionment : 4.6x

Require flat file :-

ROW 1 BGR00
ROW 2 BKOND1
ROW 3 BKOND2 - no scale
ROW 4 BKOND2 - no scale
ROW 5 BKOND3 - with scale
ROW 6 BKOND2 - no scale

Sample flat file for uploading table A305 - Customer/Material with release status :-

0BIPRICE 123SAPABAP X
1VK15 A305V PR00
2ALL 990000123456SAP8204142100 2002043020020401 50USD 100PC
2ALL 990000123456SAP8217168100 2002043020020401 50USD 100PC
3 100PC 2
3 200PC 1
2ALL 990000123456SAP8220133910

There a total of 4 flat file format :-
BGR00 - Session Header Record



------------------------------------------------------------------------------------------

| Field name | Description | Report header | Cat. | Length | Dec. |

------------------------------------------------------------------------------------------

| STYPE | Record type | 0 | CHAR | 000001 | 000000 |

| GROUP | Group name | BI Session Name | CHAR | 000012 | 000000 |

| MANDT | Client | Your client no | CLNT | 000003 | 000000 |

| USNAM | User ID | Queue user ID | CHAR | 000012 | 000000 |

| START | Lock until: | Queue start date | DATS | 000010 | 000000 |

| XKEEP | Keep indicator | X - don't delete SESS| CHAR | 000001 | 000000 |

| NODATA | No batch input | / | CHAR | 000001 | 000000 |

------------------------------------------------------------------------------------------



BKOND1 - Header Record



------------------------------------------------------------------------------------------

| Field name | Description | Report header | Cat. | Length | Dec. |

------------------------------------------------------------------------------------------

| STYPE | Record type | 1 | CHAR | 000001 | 000000 |

| TCODE | Transaction code | TCode = VK15 | CHAR | 000020 | 000000 |

| KVEWE | Usage | U | CHAR | 000001 | 000000 |

| KOTABNR | Table | Table e.g. 305 | CHAR | 000003 | 000000 |

| KAPPL | Application | App e.g V | CHAR | 000002 | 000000 |

| KSCHL | Condition type | CTyp e.g PR00 | CHAR | 000004 | 000000 |

------------------------------------------------------------------------------------------



BKOND2 - Main Data Record



------------------------------------------------------------------------------------------





| Field name | Description | Report header | Cat. | Length | Dec. |

------------------------------------------------------------------------------------------

| STYPE | Record type | 2 | CHAR | 000001 | 000000 |

| VAKEY | VarKey | VarKey | CHAR | 000100 | 000000 |

| DATBI | Valid to | Valid to | DATS | 000010 | 000000 |

| DATAB | Valid on | Valid on | DATS | 000010 | 000000 |

| KBETR | Amount | Amount | CHAR | 000015 | 000000 |

| KONWA | R/2 table | R2tab | CHAR | 000005 | 000000 |

| KPEIN | R/2 table | R2tab | CHAR | 000005 | 000000 |

| KMEIN | | | CHAR | 000003 | 000000 |

| MWSK1 | Tax code | Tx | CHAR | 000002 | 000000 |

| KONMS | Scale UoM | UoM | UNIT | 000003 | 000000 |

| MXWRT | Amount | Amount | CHAR | 000015 | 000000 |

| GKWRT | Amount | Amount | CHAR | 000015 | 000000 |

| STFKZ | Scale type | S | CHAR | 000001 | 000000 |

| KZNEP | Exclusion | CndEx | CHAR | 000001 | 000000 |

| LOEVM_KO | Deletion indic. | D | CHAR | 000001 | 000000 |

| SKONWA | R/2 table | R2tab | CHAR | 000005 | 000000 |

------------------------------------------------------------------------------------------



BKOND3 - Scale Data Record



------------------------------------------------------------------------------------------

| Field name | Description | Report header | Cat. | Length | Dec. |

------------------------------------------------------------------------------------------

| STYPE | Record type | 3 | CHAR | 000001 | 000000 |

| KSTBM | Quantity | Quantity | CHAR | 000018 | 000000 |

| KONMS | Scale UoM | UoM | UNIT | 000003 | 000000 |

| KBETR | Amount | Amount | CHAR | 000015 | 000000 |

------------------------------------------------------------------------------------------